Millo Blocks

This ongoing project for two identical apartment buildings tackles the difficult situation of the context: a fragmented newly developed area on the outskirts of Bucharest, alongside an urban planning regulation that imposes a setback of the 3rd level and a request from the client that the project may allow for a future, theoretical, seamless addition of a 4th level.

Our response to these prerequisites was a controlled deformation of the buildings themselves, by way of proposing a clear structural grid that is skewed horizontally (creating green pocket areas), this logic allowing for the setback 3rd level and the theoretical future 4th level without disrupting the overall volume.

Architectural design: Atelier dePlano / Emil Burbea-Milescu, Laura Covaci, Radu Ponta, Amanda Bușe, Lidia Danil, Ioana Gheorghiță, Alexandru Mihalescu
Structural engineering: Rofer Design SRL
MEP Engineering: Smart Design Instalatii SRL, Future Electric Energy Project SRL
3D Rendering: Tudor Antemir

Location: Ilfov
Years: 2023-ongoing

keyboard_arrow_up